EPS@ISEP | The European Project Semester (EPS) at ISEP


Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
plan [2015/03/06 09:49] – [Tasks] team1plan [2015/06/21 23:49] (current) – [Gantt Chart] team1
Line 25: Line 25:
 | Product design                | Adrian de la Torre  |   | Product design                | Adrian de la Torre  |  
 | Electrical calculation        | Daniel Berenyi and Murat Güsan|   | Electrical calculation        | Daniel Berenyi and Murat Güsan|  
-| Build the solar dehydrator    | all|    +| Build the solar dehydrator    | All|    
-| Development of the structure  +| Development of the structure  of the dehydrator             | Leonore Hood, Adrian de la Torre, Frederike Brunke| 
-  of the dehydrator             | Leonore Hood, Adrian de la Torre, Frederike Brunke| +| Research                      | All|
-| Research                      | all|+
 | Communicaton                  | Hubert Noral| | Communicaton                  | Hubert Noral|
-| Final report                  | all+| Final report                  | All
-| Final presentation            | all|+| Final presentation            | All|
 | Eco eficiency for measures    | Daniel Berenyi and Murat Güsan| | Eco eficiency for measures    | Daniel Berenyi and Murat Güsan|
 | Ethical concerns              | Leonore Hood, Adrian de la Torre, Frederike Brunke| | Ethical concerns              | Leonore Hood, Adrian de la Torre, Frederike Brunke|
 +
  
  
 ===== Gantt Chart ===== ===== Gantt Chart =====
-{{:gantt_chart.gif|}}+ 
 +{{:gantt_chart.jpg?600|}} 
 + 
 +weekly gantt chart (15/06/2015 - 21/06/2015)  
 + 
 + 
 +{{:qwe.png?1000|}}
QR Code
QR Code plan (generated for current page)